XXL Assembly
After the frames are welded, the crane sections are aligned. This is an extremely precise job that can be done only by experienced specialists. Tolerances of only 1.5 mm in height and 3 mm in width on a crane section of more than 12 metres in length illustrate perfectly the precision achieved.
After that, heads and collars are welded to the crane booms. After a final and thorough quality inspection, the crane booms are then painted. The finished crane booms are then sent directly to the crane constructor.
Chassis, turntables and complete crane booms
For the assembly of the chassis for telescopic cranes, our new factory in Gliwice, Poland has been equipped with the latest processing facilities. Chassis of up to 15 metres in length are effortlessly welded, mechanically processed and painted. Unique turning facilities enable the welding and the quality control to take place in the most optimal circumstances.
Our finished products are then sent to the client for final assembly.